Quick facts
Operational capacity: 40 megawatts (MW)
Total solar panels: 450,000 (stages one and two)
Estimated total energy generated: 98 GWhr/Year
Solar farm land usage: 244 hectares (stages one and two)
Tracking: 10 MW fixed, 30 MW single axis tracking
Stage One
Completed 2012
10 megawatts
150,000 PV panels
Stage Two
Completed 2020
30 megawatts
300,000 PV panels
Harnessing the sun
Western Australia, particularly the Mid West region, receives plenty of sunshine throughout most of the year. This makes it an exceptional location for solar generation.
How does a solar farm work?
Solar photovoltaic cells inside solar panels are mounted on racks which run in rows, across an area exposed to a large amount of sunlight.
As the sun hits those solar photovoltaic cells, electrons flow in a low voltage known as direct current (or DC) electricity.
This DC electricity flows from the solar panels through a network of underground cabling to a solar inverter.
The inverter transforms the DC into alternating current (AC).
The solar farm is connected to Western Power transmission network, where the AC can travel to power homes and businesses across the SWIS.
Solar tracking technology
As part of the Stage 2 expansion of the solar farm, an additional 300,000 solar panels were installed alongside the original 150,000. These panels operate on a NEXTracker single axis system, which rotates the panels to follow the sun to generate more power in the mornings and afternoon compared to fixed panels.
Construction and operations
The project is owned by Bright Energy Investments, with development and asset management led by Synergy Renewable Energy Developments (SynergyRED).
Construction was delivered by JUWI Renewable Energy Pty Ltd. Operations and maintenance is managed by NovaSource Power Services, with on-site maintenance undertaken by local technicians.
Greenough River Solar Farm
Greenough River Solar Farm is located across a collection of farming properties near Walkaway, approximately 50 kilometres south east of Geraldton. Built in two stages, with the first stage completed in 2012, Greenough River Solar Farm was the first utility-scale solar generation facility in Australia.
Greenough River Solar Farm takes advantage of strong solar resource in the region, providing a significant contribution of renewable energy to the South West Interconnected System (SWIS).
Bright Energy Investments in the community
Leeman Country and Sporting Club received a grant for solar panels in 2024
Louie, Joe and Sol Connell enjoying the new shade sails at Greenhead Community Association
Carnamah big tractor and country carnival event supported in 2024
New interpretive signage at the Osprey Nest in Green Head, supported in 2024
Carnamah big tractor and country carnival event supported in 2024
St Johns Ambulance WA Leeman & Green Head Sub-Centre grant for a high-pressure washer in 2023
Coorow Primary School P&C Association received a grant for new carpet and blinds to a school library in 2024